Winding down the transition project
Per library staff town halls completed
Members of working groups will be moved into their equivalent Marmot committees
Cataloging conversations and work on the guidelines still has more work to go. A draft of these guidelines should be ready for next week’s cataloging transition meeting.
Pika theming updates are underway and C.J. should have some mockups available for review in the coming week
Website content and Google Drive content. Everyone will still have access to content, but Marmot staff are working to determine the best way to preserve and provide access to those materials. No access will be lost prior to the website shutting down.
Most Flatirons vendor contracts are either pending final signatures or are completed.
Marmot membership agreements are processing through city procurement procedures.
Pika Ubuntu server migration scheduled for Tuesday, 12.13.22.
Pika test sites with new domains e.g. boulder2.marmot.org are now available and browseable
Prepping for Shoutbomb server migration
Initial set of Tableau (statistics) reports for go live
Circulation by location code report
Lends and Borrows report (where courier is used)
Percentage checked out by location code/i-type
Turnover by location code/i-type
Hold to item/order ratio report
Found that the patron load profile (pov) was not loading the PIN fields from incoming files. Instead it was taking the name field and copying it over to the PIN field. We have removed the line from the loader that copied the field and added a new line to pay attention to the incoming PIN fields.